The subject of the work is the delivery of a complete solution for the extraction of transfer chute in the rough coal sorting plant of the Ledvice Coal Processing Plant – SD JSC. In total, it is the extraction of coal dust from 4 transfer chute and 2 belt conveyors.
More..Investment
Reduction of fugitive emissions of the homogenization landfill North – ArcelorMittal Ostrava a.s.
The subject of performance was the delivery of selected parts of technological equipment including steel structures, modifications of equipment and constructions for transport of required materials from the agglomeration North to the agglomeration South. All equipment required for connection to the existing transport routes on the agglomeration South and agglomeration North and its operation was […]
More..K11 pressure part overhauling – internal fuel transport line, Mondi Štětí, a.s.
As a part of the reconstruction of the K11 boiler in the Mondi Štětí paper mill, a complete replacement and modernization of the internal fuel transport was carried out. The fuel routes are divided into two separate coal routes with a capacity of 50 t/hour and one bio fuel route with a capacity of 84 t/hour.
More..Reconstruction and Modification of Existing Desulphurisation Technology
The subject of the work is the supply of technological equipment for unloading of the Sorbacal wagons and transport to the storage silo and the implementation of SO1, SO2, and SO4 buildings. Another operational set is PS01 – Pneumatic transport leading from the unloading point (rail transport) to the silo and technological equipment of the silo. Part of our delivery is the foundation and construction of a steel structure supporting a 40m sorbent silo and construction of buildings for the necessary technology and a new electrical substation.
More..Reconstruction of Crushed Coal Container Lining, Air Cannons, Replacement of Slide Gates and Repair of Fuel Feeders
The subject of the work is the reconstruction of the existing chain conveyors and coal container of the fluidized bed boiler K4 – 4 separate fuel routes.
More..Diamo – Reconstruction of Neutralization and Decontamination Station Technology – NDS6
The subject of the work is the supply and installation of structures and equipment as a part of a complete reconstruction or construction of a new Neutralization and decontamination station NDS6.
More..Reconstruction and Reconstruction of Equipment for Slag Discharge from Silos
Reconstruction of the discharge device from slag silos A and B and installation of a new capacity downpipe of the emergency drainage of the slag silos.
More..Replacement of Coal Slide Gates on K6
The subject of the work is a replacement of slide gates with a hydraulic drive for slide gates DU 500-100-EP with a servo-drive.
More..Waterwork Klabava – Improving the Retention and Ensuring of the Water Works Against Effects of Large Waters
TRANSPORTA Technology s.r.o. participated in the implementation of the project “Water works Klabava – improving retention and securing water works against the effects of large waters”.
More..