inPROJEKT LOUNY ENGINEERING – Feasibility study of the return transport of slag from the repository to railway wagons at power plant Počerady
Lasselsberger – construction implementation documentation for the extension of the material preparation line
DIAMO – Study of the separation line of uranium ore tailings
ČEZ – Elaboration of the cooling screw technology design of the rear outlet of ash
MONDI Štětí – Lime transport documentation – construction implementation documentation for contractor selection
MONDI Štětí -Industrial vacuum cleaner documentation – construction implementation documentation for contractor selection
inPROJEKT LOUNY ENGINEERING – Addition of protective networks under the pipe conveyor KOCH400 over public roads – construction implementation documentation for contractor selection
inPROJEKT LOUNY ENGINEERING – Loading of Gypsum to truck transport at power plant Prunéřov II
ČEZ – Feasibility study of the modification of the pipe conveyor KOCH ETK11-12 to an open u-shaped conveyor at power plant Prunéřov II
ČEZ – Feasibility study of the modification of separate pneumatic conveying of fly ash from the rear traction from blocks C-D-E to fly ash silos at power plant Prunéřov II
ČEZ – Feasibility study of the system of extraction and dedusting of ash filling points from the rear draft of blocks C-D-E to the common slag conveyor ETK11 and 12 at power plant Prunéřov II
inPROJEKT LOUNY ENGINEERING – Documentation for issuing a building permit in the details of the implementation documentation – Loading Gypsum to train transport at power plant Tušimice
inPROJEKT LOUNY ENGINEERING – Elaboration of documentation of a new transport line for loading wagons with gypsum at power plant Tušimice
inPROJEKT LOUNY ENGINEERING – Elaboration of documentation of a new transport line for loading trucks with gypsum at power plant Tušimice