The Delivery of New Ammonium Sulfate Dispatch

The subject of the project was the delivery of new technology for the ammonium sulfate expedition at SPOLANA s.r.o. in Neratovice. The contract involved supplying two new excavator machines and a dispatching belt conveyor. In the first phase of the project, the old belt conveyor and one excavator machine were demolished and replaced with new […]

More..

Ammonium Sulphate Crusher

The subject of the work was the delivery, assembly and commissioning of the technology of crushing large pieces / lumps in the transported material for the dispatch of ammonium sulphate.Ammonium sulphate lumps are formed by moisture and can reacha size of up to 300 mm. The maximum allowed size of crushed lumpsis 20 mm. For […]

More..

Extraction of the Coarse Sorting Plant

The subject of the work is the delivery of a complete solution for the extraction of transfer chute in the rough coal sorting plant of the Ledvice Coal Processing Plant – SD JSC. In total, it is the extraction of coal dust from 4 transfer chute and 2 belt conveyors.

More..

Reduction of fugitive emissions of the homogenization landfill North – ArcelorMittal Ostrava a.s.

The subject of performance was the delivery of selected parts of technological equipment including steel structures, modifications of equipment and constructions for transport of required materials from the agglomeration North to the agglomeration South. All equipment required for connection to the existing transport routes on the agglomeration South and agglomeration North and its operation was […]

More..

Reconstruction and Modification of Existing Desulphurisation Technology

The subject of the work is the supply of technological equipment for unloading of the Sorbacal wagons and transport to the storage silo and the implementation of SO1, SO2, and SO4 buildings. Another operational set is PS01 – Pneumatic transport leading from the unloading point (rail transport) to the silo and technological equipment of the silo. Part of our delivery is the foundation and construction of a steel structure supporting a 40m sorbent silo and construction of buildings for the necessary technology and a new electrical substation.

More..