It concerned the reconstruction of the belt conveyors, the tripper car and the elevator. New drums were provided for belt conveyors and stations were repaired.
Reconstruction of the elevator included the replace of important parts such as drums, belts and corroded parts of stations.
The contract included preparation of production documentation, delivery of components, disassembly and assembly work. The reconstruction took place in a very demanding space in a short period of time.